PROJECT ENGINEERING


Taking advantage of a team of engineers with many years of experience, we also take care of the structural sector for small and large projects.

Main civil engineering works:

  • IACP of Latina n.2 Buildings for houses in NORMA: Structural calculations Amount of works L.1.000.000.000 cat. Ig
  • Adaptation and refunctionalization project for the re-use of the former Agricultural Consortium of Rome – via Fermi- Study of the internal and external metal structures of the body D Amount of the works L. 2,500,000,000.
  • MUNICIPALITY OF LATINA: final and executive project and Legislative Decree of elevation works of the new bus station, and verification of the existing building pursuant to O.P.C.M. 3274/2003 and s.m. Seismic adjustment of the existing structure in c.a. Amount of the works € 794.290,00
  • CENTOSTAZIONI S.p.A .: Structural modeling and assessments on the safety level of the Pisa Centrale Station’s passenger building in accordance with the provisions of the seismic regulations issued with the Ordinance of the P.C.M. n.3274 / 2003 and subsequent D.P.C.M. 3685/2003
  • MUNICIPALITY OF NORMA (LT) First stabilization interventions and made safe by the danger of rockfall of the S.P. Norbana. Main category OS12. Activity carried out Preliminary, final and executive design, Works Management, Safety Coordination
  • MUNICIPALITY OF NORMA (LT) More urgent interventions to stabilize the slope and make safe from the danger of rockfall of the S.P. Norbana. Main category OS12-OS21 Activity carried out Preliminary, final and executive design, Works Management, Safety Coordination
  • MUNICIPALITY OF ROME consolidation of foundations and elevation structure of a building intended as a hotel to be built in Rome via Collatina. MC 50,000 Amount of the works € 2,000,000.00
  • PROVINCE OF LATINA Works to adapt to the hygiene and health standards of the Bianchini Institute in Terracina Amount of works € 80,000.00
  • SOC. EDEN srl (Rocca di Mezzo) Structural design of a 20-room hotel in a seismic zone in the province of L’Aquila. Amount of works € 450,000.00. Performance: Consulting on cat. Ig
  • CMBernardini (Iraq) Calculations of the steel structures of a refining complex of vegetable oil to be carried out in IRAQ on behalf of the KADO Company Amount of the iron works € 600,000.00 Amount of foundation works € 200,000.00 Services: Consulting on structures cat. Ig
  • Sabelli Trading s.r.l. (Rome) Calculations of the mixed reinforced concrete-steel elevation structures, reinforced concrete foundation and ground containment (pile bulkhead) for a newly constructed building in Rome via Sabelli corner via dei Reti Amount of elevation works € 800,000, 00 Amount of foundation works and bulkhead € 600,000.00 Performance: Design of the structures cat. Ig

CONTACT US